From the Front Window

Begun a year ago, the apartments in this 4 story apartment building are being assigned to lease on a point system.

Begun a year ago, the apartments in this 4 story apartment building are being assigned to lease on a point system.

Built by hand, boards for scaffolding were passed up the side from one man to another on the floor above, then nailed in place.

Built by hand, boards for scaffolding were passed up the side from one man to another on the floor above, then nailed in place.

Stucco applied on top of the white insulation, was held in place by thin netting.

Stucco applied on top of the white insulation, was held in place by thin netting.

Interesting contrast - dark wet stucco being applied over the white insulation.

Interesting contrast - dark wet stucco being applied over the white insulation.

September 10, 2009 at 8:15 pm Leave a comment